Rooftop solar
Cut daytime electricity costs with rooftop solar
Factories, warehouses, offices and shops use most power in daytime — exactly when solar produces. Estimate first, then get a free assessment.
Who benefits most
High consumption + high daytime load + large open roof — when all three match, solar makes the strongest case.
Factories and industry
Garments, textiles, manufacturing, food processing, cold storage, large warehouses.
Details →Commercial buildings
Office buildings, shopping complexes, hotels, distribution centres.
Details →Institutions
Schools, colleges, hospitals, NGOs and other institutions.
Get an assessment →Homes
Houses and apartment buildings — hybrid if you need backup.
Details →How rooftop solar works
Panels make DC power in daylight; the inverter turns it into AC for the building. A hybrid stores surplus in a battery; on-grid sends it to the grid through the net meter.
Solution types
Final size and cost are set after the assessment and site survey. These types give you a starting point.
5 kWp on-grid
For small offices, shops, SMEs or suitable homes. Daytime power from solar, the rest from the grid.
Discuss this →20 kWp on-grid + net metering
For commercial buildings and small to medium factories.
Discuss this →20 kWp+ custom
For large factories, warehouses and industry — designed from a site survey and consumption analysis.
Discuss this →How a solar project usually moves forward
With us, it starts with a free initial assessment. The next steps are agreed after looking at your site and needs.
-
Understand your use
Review bills, sanctioned load and daytime use.
-
Site survey
Check roof area, condition, shading and electrical setup.
-
Design and quotation
Right-sized system, equipment and a written quotation.
-
Installation, net metering and care
Installation, net metering application where applicable, then monitoring and maintenance.
Net metering in brief
-
Daytime
Solar power runs your equipment first. Any surplus flows through the meter to the grid (export).
-
Evening and night
Solar is off, so you draw from the grid (import) — or from the battery first if hybrid.
-
Month end
The meter records both directions. Your bill offsets export against import — at the guideline's rate and conditions.
- The Net Metering Guideline 2025 was published under the Power Division's National Rooftop Solar Program.
- Eligible LT, MT, HT and EHT customer categories can take part, subject to conditions.
- You apply online, followed by a site inspection and approval.
- Panels and inverters must meet the approved standards.
Rates and conditions can change. Check the latest Power Division guideline before deciding — we help with this during the assessment.
Greater Dhaka industrial areas
- Gazipur
- Tongi
- Konabari
- Sreepur
- Savar
- Ashulia
- Fatullah
- Siddhirganj
- Kanchpur
- Rupganj
- Tejgaon
- Keraniganj
- Uttara
Free solar assessment
Find out if solar suits you
Share a few details — our team will do an initial review and contact you about the next step (site survey and quotation). You can send a photo of your bill on WhatsApp afterwards.
Free solar assessment
Your inquiry has been saved
Inquiry ID:
An inquiry on the same topic was saved from this number a moment ago, so we did not create a duplicate.
Keep this ID — mention it when you contact us so we can help faster.
What happens next
Send on WhatsAppSolar FAQ
What is net metering?
You use the power from your rooftop first and export the surplus to the grid, which is adjusted in your bill. Under the Power Division's net metering guideline, eligible customer categories can join through an online application, site inspection and approval. Rates and conditions can change.
How much does solar cost?
It depends on size, type (on-grid or hybrid), battery, roof condition and equipment. A written quotation follows the assessment and site visit.
How much roof space is needed?
For planning we assume roughly 100 sq ft of open roof per kWp, including walkways. Shade, structure and orientation are checked in the site survey.
Will solar work during a power cut?
On-grid systems switch off when the grid is down, for safety. To keep running during power cuts you need a hybrid system with batteries.
Can homes request an assessment too?
Yes. Our main focus is factories and commercial buildings, but homes are welcome to apply too.
